Project Completion Certificate (Ground Water)
Scheme ID: 20011298 Name of Scheme: PHITKARI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5025 Base Year: 2023 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 17-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 46.51 Mtr / 83.12 Mtr PHITKARI 29.067966 77.858489
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 LPM / 54 Mtr PHITKARI 29.067966 77.858489
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 16 M PHITKARI 29.067966 77.858489
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.02460
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.013
2 HDPE 90 0.387
3 HDPE 110 0.116
4 HDPE 125 0.119
5 HDPE 140 0.102
6 HDPE 160 0.462
HSC Connection
Sno. Total Nos.
1 906
Other Details
3.62
3.62
2.88
05-Aug-2023
10-Mar-2025