Project Completion Certificate (Ground Water)
Scheme ID: 20011307 Name of Scheme: AMARPUR MAZRA KHANDAWLI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2760 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 35.05 M / 103.81 M Amarpur Mazra Khandawali 28°54'29.2"N 77°52'32.5"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50 M Amarpur Mazra Khandawali 28°54'29.2"N 77°52'32.5"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 175 Kl / 12 M 175 Kl / 12 M Amarpur Mazra Khandawali 28°54'29.2"N 77°52'32.5"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.897
2 HDPE 90 0.211
3 HDPE 110 0.106
4 HDPE 125 0.128
5 HDPE 140 0.03
6 HDPE 160 0.065
7 HDPE 180 0.068
HSC Connection
Sno. Total Nos.
1 471
Other Details
2.04
2.04
2.02
20-Mar-2023
10-Nov-2024