Scheme ID: 20011330 Name of Scheme: JAMUNIYA No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2910 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 08-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30Mtr/ 113.85Mtr JAMUNIYA 27.366818 80.451323
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45Mtr JAMUNIYA 27.366818 80.451323
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/ 16Mtr JAMUNIYA 27.366891 80.451268
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02094
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.502
2 HDPE Pipe PN-6, Class PE-100 75 1.805
3 HDPE Pipe PN-6, Class PE-100 90 0.936
4 HDPE Pipe PN-6, Class PE-100 110 1.517
5 HDPE Pipe PN-6, Class PE-100 125 1.807
6 HDPE Pipe PN-6, Class PE-100 160 3.181
HSC Connection
Sno. Total Nos.
1 387
Other Details
2.63
0.00
2.51
07-Jan-2024
03-Dec-2024