Project Completion Certificate (Ground Water)
Scheme ID: 20011375 Name of Scheme: ALAPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1390 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 17-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.0Mtr/ 109.21Mtr ALAPUR 26.982006 80.223958
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.31 M³ per Min /43Mtr ALAPUR 26.982006 80.223958
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/ 12Mtr ALAPUR 26.982003 80.223817
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.01606
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 1.388
2 HDPE Pipe PN-6, Class PE-100 75 0.700
3 HDPE Pipe PN-6, Class PE-100 90 0.437
4 HDPE Pipe PN-6, Class PE-100 110 0.531
5 HDPE Pipe PN-6, Class PE-100 125 0.241
HSC Connection
Sno. Total Nos.
1 128
Other Details
1.33
0.00
1.30
16-Apr-2023
24-Dec-2024