Project Completion Certificate (Ground Water)
Scheme ID: 20011381 Name of Scheme: UGPUR No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 5660 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 15-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25.02 M/ 108.79 M UGPUR 27.234105 80.436158
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.300 M³ per Min /45Mtr UGPUR 27.234105 80.436158
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 16 Mtr UGPUR 27.23409 80.436165
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.02274
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 6.7645
2 HDPE Pipe PN-6, Class PE-100 75 4.6527
3 HDPE Pipe PN-6, Class PE-100 90 6.7917
4 HDPE Pipe PN-6, Class PE-100 110 0.7125
5 HDPE Pipe PN-6, Class PE-100 125 0.388
6 HDPE Pipe PN-6, Class PE-100 140 0.354
7 HDPE Pipe PN-6, Class PE-100 160 1.816
8 HDPE Pipe PN-6, Class PE-100 180 0.502
9 HDPE Pipe PN-6, Class PE-100 200 0.354
HSC Connection
Sno. Total Nos.
1 925
Other Details
4.26
0.00
4.05
14-Sep-2023
24-Dec-2024