| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011397 | Name of Scheme: MUTHIYA | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 5140 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 14-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27 M/ 101.3 M | MUTHIYA | 27.25632 | 80.417477 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1.200 M³ per Min /45Mtr | MUTHIYA | 27.25632 | 80.417477 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350 KL/ 16 Mtr | MUTHIYA | 27.256227 | 80.417547 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D. I. Pipe | 200 | 0.01959 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 4.4294 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 3.9214 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 2.8129 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 1.185 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 140 | 1.090 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.194 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 180 | 0.368 | |
| 8 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.490 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 772 |