Project Completion Certificate (Ground Water)
Scheme ID: 20011402 Name of Scheme: KURSI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 05-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18Mtr/ 180Mtr KURSI 27.273213 80.428656
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.5 M³ per Min /43Mtr KURSI 27.273213 80.428656
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/ 12Mtr KURSI 27.273245 80.428768
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I Pipe 150 0.01884
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.898
2 HDPE Pipe PN-6: Class PE-100 75 1.255
3 HDPE Pipe PN-6: Class PE-100 90 0.774
4 HDPE Pipe PN-6: Class PE-100 110 0.344
5 HDPE Pipe PN-6: Class PE-100 125 0.603
6 HDPE Pipe PN-6: Class PE-100 160 0.986
HSC Connection
Sno. Total Nos.
1 403
Other Details
1.85
0.00
1.90
04-Dec-2023
24-Dec-2024