Project Completion Certificate (Ground Water)
Scheme ID: 20011407 Name of Scheme: GIRDHARPUR No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2600 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 10-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.03Mtr/ 109.93Mtr GIRDHARPUR 27.274409 80.397831
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /45Mtr GIRDHARPUR 27.274409 80.397831
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 14Mtr GIRDHARPUR 27.2745 80.398219
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I Pipe 150 0.0207
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.245
2 HDPE Pipe PN-6, Class PE-100 75 1.886
3 HDPE Pipe PN-6, Class PE-100 90 4.178
4 HDPE Pipe PN-6, Class PE-100 110 1.015
5 HDPE Pipe PN-6, Class PE-100 160 0.901
HSC Connection
Sno. Total Nos.
1 604
Other Details
2.25
0.00
2.23
09-Aug-2023
24-Dec-2024