Project Completion Certificate (Ground Water)
Scheme ID: 20011421 Name of Scheme: Chauri No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 18-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.57/120.4 Chauri 27.08166 83.3596
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 48/39 Chauri 27.08166 83.3596
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/12 Chauri 27.0877 83.3595
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 1
2 HDPE 140 0.937
3 HDPE 110 0.341
4 HDPE 90 0.355
5 HDPE 75 2.081
6 HDPE 63 4.539
HSC Connection
Sno. Total Nos.
1 410
Other Details
2.76
0.00
2.60
17-Feb-2024
22-Nov-2024