| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011432 | Name of Scheme: Sikri WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2685 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 10-Dec-2021 | Actual Date of Completion (Capex): 09-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube wells | 18.42/103.32 | sikri | 28.244651 | 77.811020 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 575LPM/46Mtr. | sikri | 28.244662° | 77.811010° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 150KL/16M | sikri | 28.244564° | 77.811028° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 150 | 0.0315 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE-PN-6 PE100 | 140 | 0.462.70 | |
| 2 | HDPE-PN-6 PE100 | 110 | 0.011 | |
| 3 | HDPE-PN-6 PE100 | 90 | 0.332.6 | |
| 4 | HDPE-PN-6 PE100 | 75 | 0.120 | |
| 5 | HDPE-PN-6 PE100 | 63 | 5.6188 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 484 |