Project Completion Certificate (Ground Water)
Scheme ID: 20011432 Name of Scheme: Sikri WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2685 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Dec-2021 Actual Date of Completion (Capex): 09-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube wells 18.42/103.32 sikri 28.244651 77.811020
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 575LPM/46Mtr. sikri 28.244662° 77.811010°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150KL/16M sikri 28.244564° 77.811028°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.0315
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 PE100 140 0.462.70
2 HDPE-PN-6 PE100 110 0.011
3 HDPE-PN-6 PE100 90 0.332.6
4 HDPE-PN-6 PE100 75 0.120
5 HDPE-PN-6 PE100 63 5.6188
HSC Connection
Sno. Total Nos.
1 484
Other Details
1.74
0.00
1.85
23-Nov-2024
23-Nov-2024