Project Completion Certificate (Ground Water)
Scheme ID: 20011452 Name of Scheme: TERIA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2130 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 20-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18 (M)/108.37M TERIA 27.290611 80.051571
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 480LPM/45M TERIA 27.290611 80.051571
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/16M TERIA 27.290611 80.051571
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 2.630
2 HDPE PN-6 75 1.1467
3 HDPE PN-6 90 0.8813
4 HDPE PN-6 110 2.5596
5 HDPE PN-6 125 0.0527
6 HDPE PN-6 160 1.158
HSC Connection
Sno. Total Nos.
1 341
Other Details
2.00
2.00
2.00
20-Jul-2023
25-Nov-2024