Project Completion Certificate (Ground Water)
Scheme ID: 20011539 Name of Scheme: Karmha No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 24-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.03/118.93 Karmha 26.66392 83.55859
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 18/40 Karmha 26.66392 83.55859
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Karmha 26.66247 83.55832
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 0.458
2 HDPE 110 0.182
3 HDPE 90 0.708
4 HDPE 75 1.076
5 HDPE 63 3.975
HSC Connection
Sno. Total Nos.
1 239
Other Details
1.92
0.00
1.92
23-Feb-2024
22-Nov-2024