Project Completion Certificate (Ground Water)
Scheme ID: 20011540 Name of Scheme: Burehli No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4650 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2023 Actual Date of Completion (Capex): 09-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.28/141.95 Burehli 26.940522 83.348511
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 60/42 Burehli 26.940522 83.348511
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 300/14 Burehli 26.940419 83.348680
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.035 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.804 Completed
2 HDPE 75 3.482.5 Completed
3 HDPE 110 0.555 Completed
4 HDPE 140 1.189 Completed
5 HDPE 160 0.213 Completed
6 HDPE 200 0.667 Completed
HSC Connection
Sno. Total Nos.
1 637
Other Details
3.29
0.00
3.27
08-May-2024
11-Dec-2024