Scheme ID: 20011546 Name of Scheme: USARI KHURD GP WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4732 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Apr-2023 Actual Date of Completion (Capex): 11-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Plain Pipe (m) 210.33 TW 25.629784 83.421578
2 Depth of Strainer (m) 52.12 TW 25.629784 83.421578
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 600/47 TW 25.629784 83.421578
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Tank 300/15 OHT 25.629784 83.421578
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 530
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 13.82
2 HDPE 75 2.0
3 HDPE 90 0.59
4 HDPE 110 1.32
5 HDPE 140 0.28
6 HDPE 160 0.668
7 HDPE 200 0.05
HSC Connection
Sno. Total Nos.
1 689
Other Details
4.91
4.73
3.58
11-Dec-2024
12-Dec-2024