Project Completion Certificate (Ground Water)
Scheme ID: 20011549 Name of Scheme: KANAIL No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-May-2023 Actual Date of Completion (Capex): 06-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.12/117.41 Kanail Mus. 26.5894 83.4604
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 45/43 Kanail Mus. 26.5894 83.4604
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/16 Kanail Mus. 26.5894 83.4604
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.657 Laying Completed
2 HDPE 75 0.213 Laying Completed
3 HDPE 90 0.237 Laying Completed
4 HDPE 110 0.24 Laying Completed
5 HDPE 140 0.789 Laying Completed
HSC Connection
Sno. Total Nos.
1 543
Other Details
2.26
0.00
2.25
05-Oct-2025
02-Feb-2026