| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011550 | Name of Scheme: Kasihar | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2450 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2023 | Actual Date of Completion (Capex): 29-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.00/121.48 | Kasihar | 26.574125 | 83.429304 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 33/43 | Kasihar | 26.486564 | 83.427493 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 150/16 | Kasihar | 26.574243 | 83.429271 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.030 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.953 | Completed |
| 2 | HDPE | 75 | 0.179 | Completed |
| 3 | HDPE | 90 | 0.016 | Completed |
| 4 | HDPE | 110 | 0.419 | Completed |
| 5 | HDPE | 140 | 0.153 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 316 |