Project Completion Certificate (Ground Water)
Scheme ID: 20011550 Name of Scheme: Kasihar No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2450 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2023 Actual Date of Completion (Capex): 29-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.00/121.48 Kasihar 26.574125 83.429304
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33/43 Kasihar 26.486564 83.427493
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 150/16 Kasihar 26.574243 83.429271
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.953 Completed
2 HDPE 75 0.179 Completed
3 HDPE 90 0.016 Completed
4 HDPE 110 0.419 Completed
5 HDPE 140 0.153 Completed
HSC Connection
Sno. Total Nos.
1 316
Other Details
1.71
0.00
2.20
28-Apr-2025
10-Sep-2025