Scheme ID: 20011596 Name of Scheme: PABLI KHURD No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2572 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.35 Mtr / 98.39 Mtr PAVLI KHURD 29.065908 77.670657
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 LPM / 50 Mtr PAVLI KHURD 29.065908 77.670657
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 Kl / 12 M PAVLI KHURD 29.065908 77.670657
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.082
2 HDPE 90 0.236
3 HDPE 110 0.070
4 HDPE 140 0.163
5 HDPE 160 0.282
HSC Connection
Sno. Total Nos.
1 504
Other Details
2.33
2.33
1.89
31-Mar-2023