Project Completion Certificate (Ground Water)
Scheme ID: 20011611 Name of Scheme: KHARAILA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2620 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-May-2023 Actual Date of Completion (Capex): 27-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/128.82 Kharaila 26.7301 83.2310
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33,39 Kharaila 26.7301 83.2310
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/14 Kharaila 26.7301 83.2310
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030 Pipe Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.883 Laying Completed
2 HDPE 75 0.364 Laying Completed
3 HDPE 110 0.237 Laying Completed
4 HDPE 140 0.171 Laying Completed
HSC Connection
Sno. Total Nos.
1 305
Other Details
1.68
0.00
1.78
26-Jul-2024
09-Dec-2024