| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011614 | Name of Scheme: Rebha Muradpur | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2940 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Apr-2023 | Actual Date of Completion (Capex): 06-Feb-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.01 Mtr/ 111.01 Mtr | Rebha Muradpur | 27.6556 | 79.989725 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.7 M³ per Min /45Mtr | Rebha Muradpur | 27.6556 | 79.989725 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225KL/ 16Mtr | Rebha Muradpur | 27.654881 | 79.991468 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.02912 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 3.848 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 1.666 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 1.304 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 1.499 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 0.643 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.331 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 524 |