Project Completion Certificate (Ground Water)
Scheme ID: 20011695 Name of Scheme: SITARGANJ NAVDIA MUST VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2860 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Jan-2023 Actual Date of Completion (Capex): 25-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Work 16.55/96 Sitarganj Navdia 28°16'48.6"N 79°46'26.4"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 10 HP .57/36 Sitarganj Navdia 28°16'48.6"N 79°46'26.4"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank (Conventional) 175/12 Sitarganj Navdia 28°16'48.7"N 79°46'25.9"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Rising main K-7 125 .036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 1.175
2 HDPE Pipe 75 1.103
3 HDPE Pipe 90 .901
4 HDPE Pipe 110 0.088
5 HDPE Pipe 140 .467
6 HDPE Pipe 160 .047
7 HDPE Pipe 200 .039
HSC Connection
Sno. Total Nos.
1 470
Other Details
179.21
179.21
178.21
30-May-2023
30-May-2023