Project Completion Certificate (Ground Water)
Scheme ID: 20011700 Name of Scheme: Karhi No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2030 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2023 Actual Date of Completion (Capex): 10-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16/119.86 Karhi 26.5912 83.4982
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 27/40 Karhi 26.5912 83.4982
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/12 Karhi 26.5912 83.4982
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.870 Laying Completed
2 HDPE 75 1.746 Laying Completed
3 HDPE 90 0.302 Laying Completed
4 HDPE 110 0.180 Laying Completed
5 HDPE 140 0.054 Laying Completed
HSC Connection
Sno. Total Nos.
1 292
Other Details
1.62
0.00
1.68
09-Apr-2024
22-Nov-2024