Project Completion Certificate (Ground Water)
Scheme ID: 20011739 Name of Scheme: PIPARIYA No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3600 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 25-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30 Mtr/ 103.8 Mtr PIPARIYA 27.644525 79.846927
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /45 Mtr PIPARIYA 27.644525 79.846927
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 16 Mtr PIPARIYA 27.644614 79.84667
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02751
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.063
2 HDPE Pipe PN-6, Class PE-100 75 3.234
3 HDPE Pipe PN-6, Class PE-100 90 1.380
4 HDPE Pipe PN-6, Class PE-100 110 1.961
5 HDPE Pipe PN-6, Class PE-100 140 2.617
6 HDPE Pipe PN-6, Class PE-100 160 1.565
7 HDPE Pipe PN-6, Class PE-100 180 0.040
HSC Connection
Sno. Total Nos.
1 503
Other Details
3.03
0.00
2.70
24-Aug-2023
24-Dec-2024