Project Completion Certificate (Ground Water)
Scheme ID: 20011744 Name of Scheme: Turna Rudra Piparchak No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2790 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 04-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 16 Mtr/ 77 Mtr Turna Rudra Piparchak 27.030404 80.363945
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45 Mtr Turna Rudra Piparchak 27.030404 80.363945
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/ 16 Mtr Turna Rudra Piparchak 27.030333 80.363877
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0203
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.723
2 HDPE Pipe PN-6, Class PE-100 75 1.368
3 HDPE Pipe PN-6, Class PE-100 90 1.026
4 HDPE Pipe PN-6, Class PE-100 110 2.374
5 HDPE Pipe PN-6, Class PE-100 125 1.359
6 HDPE Pipe PN-6, Class PE-100 140 0.184
7 HDPE Pipe PN-6, Class PE-100 160 0.219
HSC Connection
Sno. Total Nos.
1 342
Other Details
2.32
0.00
2.17
03-May-2023
24-Dec-2024