| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011779 | Name of Scheme: Saktalpur Milak Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2870 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 10-Feb-2022 | Actual Date of Completion (Capex): 09-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 100 | 0.2 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN -6: CLASS PE -100 | 63 | 3.32 | |
| 2 | HDPE PIPE PN -6: CLASS PE -100 | 75 | 0.10 | |
| 3 | HDPE PIPE PN -6: CLASS PE -100 | 90 | 0.37 | |
| 4 | HDPE PIPE PN -6: CLASS PE -100 | 110 | 0.25 | |
| 5 | HDPE PIPE PN -6: CLASS PE -100 | 125 | 0.59 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |