Project Completion Certificate (Ground Water)
Scheme ID: 20011786 Name of Scheme: Saddovar Bila Ahatmali Village Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 3379 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Feb-2022 Actual Date of Completion (Capex): 11-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20.00Mt / 130.00 Mtr Saddovar Bila Ahatmali 29.261048 78.580353
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 17.50 HP 970 LPM / 44 Mtr Saddovar Bila Ahatmali 29.261048 78.580353
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL /14.00 mtr Saddovar Bila Ahatmali 29.261048 78.580353
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class 63 4.160
2 HDPE Pipe PN-6 Class 75 0.982
3 HDPE Pipe PN-6 Class 90 0.393
4 HDPE Pipe PN-6 Class 110 .254
5 HDPE Pipe PN-6 Class 125 0.030
6 HDPE Pipe PN-6 Class 160 0.237
HSC Connection
Sno. Total Nos.
1 560
Other Details
2.21
2.21
2.21
09-Jun-2024
10-Jun-2024