Project Completion Certificate (Ground Water)
Scheme ID: 20011839 Name of Scheme: BABUPUR KACHANARI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2650 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 30-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.05Mtr/ 116.66Mtr BABUPUR KACHANARI 27.53042 80.313573
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.62 M³ per Min /43Mtr BABUPUR KACHANARI 27.53042 80.313573
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/ 12Mtr BABUPUR KACHANARI 27.530403 80.3135
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0265
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.233
2 HDPE Pipe PN-6, Class PE-100 75 1.392
3 HDPE Pipe PN-6, Class PE-100 90 0.534
4 HDPE Pipe PN-6, Class PE-100 110 0.230
5 HDPE Pipe PN-6, Class PE-100 140 2.183
6 HDPE Pipe PN-6, Class PE-100 160 0.339
HSC Connection
Sno. Total Nos.
1 440
Other Details
2.25
0.00
2.08
29-Aug-2023
24-Dec-2024