| Scheme ID: 20011847 | Name of Scheme: PALRA W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 7447 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 14-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24 M / 88 M | PALRA | 29.168123 | 77.404575 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP- 15 HP | 400 / 70 | PALRA | 29.168123 | 77.404575 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL / 13 MTR | PALRA | 29.161741 | 77.407902 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 100 | 0.010 | |
| 2 | K7 | 200 | 0.015 | |
| 3 | K7 | 150 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.480 | |
| 2 | HDPE | 75 | 0.109 | |
| 3 | HDPE | 63 | 4.6 | |
| 4 | HDPE | 200 | 0.714 | |
| 5 | HDPE | 180 | 0.114 | |
| 6 | HDPE | 140 | 0.064 | |
| 7 | HDPE | 125 | 0.220 | |
| 8 | HDPE | 110 | 0.14 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 780 |