Project Completion Certificate (Ground Water)
Scheme ID: 20011852 Name of Scheme: KARIM NAGAR SAIDAPUR No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 8570 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 26.08Mtr/ 115.78Mtr KARIM NAGAR SAIDAPUR 27.28281 80.256064
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ Per Min /47Mtr KARIM NAGAR SAIDAPUR 27.28281 80.256064
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/ 18Mtr KARIM NAGAR SAIDAPUR 27.282877 80.255935
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01925
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.281
2 HDPE Pipe PN-6, Class PE-100 75 6.542
3 HDPE Pipe PN-6, Class PE-100 90 3.925
4 HDPE Pipe PN-6, Class PE-100 110 2.790
5 HDPE Pipe PN-6, Class PE-100 125 2.307
6 HDPE Pipe PN-6, Class PE-100 140 2.244
7 HDPE Pipe PN-6, Class PE-100 160 1.793
8 HDPE Pipe PN-6, Class PE-100 180 0.510
9 HDPE Pipe PN-6, Class PE-100 200 3.408
HSC Connection
Sno. Total Nos.
1 822
Other Details
4.35
0.00
4.82
11-Apr-2024
24-Dec-2024