Project Completion Certificate (Ground Water)
Scheme ID: 20011881 Name of Scheme: PIPRINARAYANPUR No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2320 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 15-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.06 Mtr/ 124.78 Mtr PIPRINARAYANPUR 27.134879 80.785708
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ Per Min /45Mtr PIPRINARAYANPUR 27.606387 79.866942
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/ 14 Mtr PIPRINARAYANPUR 27.134982 80.785732
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I.Pipe 150 0.01628
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 3.571
2 HDPE Pipe PN-6 75 2.678
3 HDPE Pipe PN-6 90 1.197
4 HDPE Pipe PN-6 110 1.183
5 HDPE Pipe PN-6 125 1.239
6 HDPE Pipe PN-6 160 0.029
HSC Connection
Sno. Total Nos.
1 344
Other Details
2.03
0.00
1.98
17-Aug-2023
17-Dec-2024