Project Completion Certificate (Ground Water)
Scheme ID: 20011899 Name of Scheme: RAMPUR ATWA No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 3060 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 24-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24 Mtr/ 91.8 Mtr RAMPUR ATWA 27.098468 80.72564
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45 Mtr RAMPUR ATWA 27.098468 80.72564
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/ 14 Mtr RAMPUR ATWA 27.101064 80.723736
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01862
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.339
2 HDPE Pipe PN-6, Class PE-100 75 1.870
3 HDPE Pipe PN-6, Class PE-100 90 1.391
4 HDPE Pipe PN-6, Class PE-100 110 0.814
5 HDPE Pipe PN-6, Class PE-100 125 1.351
6 HDPE Pipe PN-6, Class PE-100 140 0.293
7 HDPE Pipe PN-6, Class PE-100 160 0.077
HSC Connection
Sno. Total Nos.
1 547
Other Details
2.37
0.00
2.15
23-Oct-2023
24-Dec-2024