Project Completion Certificate (Ground Water)
Scheme ID: 20011901 Name of Scheme: BARI No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 2780 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 25-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 20.04Mtr/ 95.81Mtr Bari 27.606322 79.867015
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6M3/Min /45Mtr Bari 27.606322 79.867015
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 14Mtr Bari 27.606322 79.867015
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0244
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Pipe PN-6 Class PE-100 63 4.3922
2 Pipe PN-6 Class PE-100 75 4.6278
3 Pipe PN-6 Class PE-100 90 4.3072
4 Pipe PN-6 Class PE-100 110 0.910
5 Pipe PN-6 Class PE-100 140 1.8289
6 Pipe PN-6 Class PE-100 160 0.132
HSC Connection
Sno. Total Nos.
1 450
Other Details
2.77
2.42
2.42
01-Apr-2023
30-Nov-2024