Project Completion Certificate (Ground Water)
Scheme ID: 20011904 Name of Scheme: SHAMSPUR No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 5540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 22-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 31 Mtr/ 121.80 Mtr SHAMSPUR 27.163281 80.310297
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.3 M³ per Min /45Mtr SHAMSPUR 27.163281 80.310297
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 16 Mtr SHAMSPUR 27.163245 80.310253
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.077
2 HDPE Pipe PN-6, Class PE-100 75 4.065
3 HDPE Pipe PN-6, Class PE-100 90 1.534
4 HDPE Pipe PN-6, Class PE-100 110 1.234
5 HDPE Pipe PN-6, Class PE-100 125 2.239
6 HDPE Pipe PN-6, Class PE-100 140 1.067
7 HDPE Pipe PN-6, Class PE-100 160 0.093
8 HDPE Pipe PN-6, Class PE-100 180 0.006
9 HDPE Pipe PN-6, Class PE-100 200 0.612
HSC Connection
Sno. Total Nos.
1 743
Other Details
3.71
0.00
3.44
21-Jun-2023
24-Dec-2024