Project Completion Certificate (Ground Water)
Scheme ID: 20011905 Name of Scheme: SUAGANDA TIGAWAN No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 01-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.08Mtr/ 123.81Mtr SUAGANDA TIGAWAN 27.122451 80.755725
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.530 M³ per Min /45Mtr SUAGANDA TIGAWAN 27.122451 80.755725
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 14Mtr SUAGANDA TIGAWAN 27.122427 80.756028
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0192
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class PE-100 63 3.183
2 HDPE Pipe PN-6 Class PE-100 75 2.616
3 HDPE Pipe PN-6 Class PE-100 90 1.957
4 HDPE Pipe PN-6 Class PE-100 110 0.695
5 HDPE Pipe PN-6 Class PE-100 160 1.717
HSC Connection
Sno. Total Nos.
1 398
Other Details
2.11
0.00
2.05
01-Jun-2023
24-Dec-2024