| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011908 | Name of Scheme: BHORAPUR | No. of Villages: 4 | No. of Habitation Covered: 5 |
| Total Population Covered: 2450 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Jun-2023 | Actual Date of Completion (Capex): 20-May-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.0 Mtr/ 121.8 Mtr | BHORAPUR | 27.499499 | 79.848565 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.55 M³ Per Min /43Mtr | BHORAPUR | 27.499499 | 79.848565 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL/ 12 Mtr | BHORAPUR | 27.499491 | 79.848460 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I Pipe | 150 | 0.0192 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6 | 63 | 3.123 | |
| 2 | HDPE Pipe PN-6 | 75 | 2.654 | |
| 3 | HDPE Pipe PN-6 | 90 | 1.498 | |
| 4 | HDPE Pipe PN-6 | 110 | 0.924 | |
| 5 | HDPE Pipe PN-6 | 125 | 0.121 | |
| 6 | HDPE Pipe PN-6 | 160 | 0.030 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 506 |