Scheme ID: 20011910 Name of Scheme: ARUPARA No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 5380 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 07-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 35.86 Mtr/ 110.37 Mtr ARUPARA 27.5644 80.135481
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.2 M³ per Min /45 Mtr ARUPARA 27.5644 80.135481
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 16 Mtr ARUPARA 27.564359 80.135281
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02194
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 6.619
2 HDPE Pipe PN-6, Class PE-100 75 4.809
3 HDPE Pipe PN-6, Class PE-100 90 2.713
4 HDPE Pipe PN-6, Class PE-100 110 2.870
5 HDPE Pipe PN-6, Class PE-100 125 0.474
6 HDPE Pipe PN-6, Class PE-100 140 0.987
7 HDPE Pipe PN-6, Class PE-100 180 2.248
8 HDPE Pipe PN-6, Class PE-100 200 1.661
HSC Connection
Sno. Total Nos.
1 697
Other Details
4.23
0.00
4.06
06-Nov-2023
24-Dec-2024