| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011914 | Name of Scheme: Koilara | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2530 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Jun-2023 | Actual Date of Completion (Capex): 08-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.05 (M)/115.76(M) | KOILARA | 27.132802 | 80.023685 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBNERSIBLE | 1000 LP/45 MTR | KOILARA | 27.132802 | 80.023685 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/16 MTR | KOILARA | 27.124665 | 80.029564 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.0017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6/HDPE | 63 | 2.9297 | |
| 2 | PN-6/HDPE | 75 | 1.1383 | |
| 3 | PN-6/HDPE | 90 | 0.6594 | |
| 4 | PN-6/HDPE | 110 | 2.0933 | |
| 5 | PN-6/HDPE | 125 | 1.0065 | |
| 6 | PN-6/HDPE | 160 | 0.4561 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 428 |