Project Completion Certificate (Ground Water)
Scheme ID: 20011931 Name of Scheme: GOPAR No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 5420 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 11-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 33.15Mtr/ 84.78Mtr GOPAR 27.253013 80.31101
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.2 M³ per Min /45Mtr GOPAR 27.253013 80.31101
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/ 18Mtr GOPAR 27.253042 80.311182
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I Pipe 200 0.01950
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 9.039
2 HDPE Pipe PN-6, Class PE-100 75 4.735
3 HDPE Pipe PN-6, Class PE-100 90 4.048
4 HDPE Pipe PN-6, Class PE-100 110 0.413
5 HDPE Pipe PN-6, Class PE-100 125 0.772
6 HDPE Pipe PN-6, Class PE-100 160 2.479
7 HDPE Pipe PN-6, Class PE-100 200 0.651
HSC Connection
Sno. Total Nos.
1 747
Other Details
3.86
0.00
3.61
10-Apr-2023
24-Dec-2024