| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011967 | Name of Scheme: Parusrampur | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2990 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Oct-2023 | Actual Date of Completion (Capex): 18-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21/127.84 | Parusrampur | 26.839012 | 83.507416 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 42/40 | Parusrampur | 26.839012 | 83.507416 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 200/12 | Parusrampur | 26.839247 | 83.507236 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.035 | Laying Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.324 | Laying Completed |
| 2 | HDPE | 75 | 1.361 | Laying Completed |
| 3 | HDPE | 90 | 0.789 | Laying Completed |
| 4 | HDPE | 110 | 0.395 | Laying Completed |
| 5 | HDPE | 140 | 0.931 | Laying Completed |
| 6 | HDPE | 160 | 0.346 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 459 |