Project Completion Certificate (Ground Water)
Scheme ID: 20011978 Name of Scheme: MAHRY No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 7880 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 18-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 M/ 103 M MAHRY 27.171864 80.297744
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.490 M³ per Min /45Mtr MAHRY 27.171864 80.297744
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 425 KL/ 16 Mtr MAHRY 27.171662 80.29766
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02127
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.0326
2 HDPE Pipe PN-6, Class PE-100 75 6.2868
3 HDPE Pipe PN-6, Class PE-100 90 3.2056
4 HDPE Pipe PN-6, Class PE-100 110 1.5016
5 HDPE Pipe PN-6, Class PE-100 125 1.146
6 HDPE Pipe PN-6, Class PE-100 180 1.6062
7 HDPE Pipe PN-6, Class PE-100 200 1.237
HSC Connection
Sno. Total Nos.
1 1147
Other Details
4.38
0.00
4.29
17-Oct-2023
24-Dec-2024