Project Completion Certificate (Ground Water)
Scheme ID: 20011979 Name of Scheme: Gangsari GP Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2241 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Jul-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24(m) / 204.3(m) Gangsari 25.89987 81.372184
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 600(M³) / 45(Mtr.) Gangsari 25.89987 81.372184
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 175 (KL) / 14(Mtr.) Gangsari 25.89987 81.372184
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 150 0.018
2 DI-K9 100 0.007
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.642
2 HDPE 75 2.926
3 HDPE 90 2.193
4 HDPE 110 2.616
5 HDPE 125 0.688
6 HDPE 140 0.214
HSC Connection
Sno. Total Nos.
1 318
Other Details
2.27
0.00
2.27
03-Dec-2024
13-May-2025