Project Completion Certificate (Ground Water)
Scheme ID: 20011980 Name of Scheme: NAGWA No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 8000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 19-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22 M/ 109.8 M NAGWA 27.171864 80.297744
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45Mtr NAGWA 27.171864 80.297744
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/ 16 Mtr NAGWA 27.171662 80.29766
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01612
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 10.4231
2 HDPE Pipe PN-6, Class PE-100 75 6.078
3 HDPE Pipe PN-6, Class PE-100 90 4.3325
4 HDPE Pipe PN-6, Class PE-100 110 2.7178
5 HDPE Pipe PN-6, Class PE-100 125 1.3974
6 HDPE Pipe PN-6, Class PE-100 140 1.554
7 HDPE Pipe PN-6, Class PE-100 160 0.4054
8 HDPE Pipe PN-6, Class PE-100 200 0.8211
HSC Connection
Sno. Total Nos.
1 1185
Other Details
3.98
0.00
3.65
18-Sep-2023
24-Dec-2024