Project Completion Certificate (Ground Water)
Scheme ID: 20012101 Name of Scheme: Pokhar Bhinda No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2860 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Oct-2023 Actual Date of Completion (Capex): 22-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17.04/113.79 Pokharbhinda 26.640618 83.591765
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/42 Pokharbhinda 26.640618 83.591765
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 200/14 Pokharbhinda 26.640618 83.5911765
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.012 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.666 Completed
2 HDPE 75 3.502 Completed
3 HDPE 90 1.508 Completed
4 HDPE 110 0.526 Completed
5 HDPE 140 0.216 Completed
6 HDPE 160 0.850 Completed
7 HDPE 200 0.461 Completed
HSC Connection
Sno. Total Nos.
1 380
Other Details
2.39
0.00
2.36
21-Aug-2024
21-Aug-2025