Project Completion Certificate (Ground Water)
Scheme ID: 20012123 Name of Scheme: JUJVAMAU No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2180 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 08-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.0 Mtr/ 108.15 Mtr JUJVAMAU 27.606387 79.866942
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.490 M³ Per Min /45Mtr JUJVAMAU 27.606387 79.866942
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/ 16 Mtr JUJVAMAU 27.606223 79.866876
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01761
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 2.811
2 HDPE Pipe PN-6 75 1.215
3 HDPE Pipe PN-6 90 0.850
4 HDPE Pipe PN-6 110 1.166
5 HDPE Pipe PN-6 160 2.084
HSC Connection
Sno. Total Nos.
1 318
Other Details
1.95
0.00
1.91
17-Jan-2024
24-Dec-2024