Project Completion Certificate (Ground Water)
Scheme ID: 20012158 Name of Scheme: AHEMI No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3040 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 24-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45Mtr AHEMI 27.611555 80.123373
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/ 18Mtr AHEMI 27.611605 80.123413
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.011
2 HDPE Pipe PN-6, Class PE-100 75 2.962
3 HDPE Pipe PN-6, Class PE-100 90 1.366
4 HDPE Pipe PN-6, Class PE-100 110 0.328
5 HDPE Pipe PN-6, Class PE-100 125 0.040
6 HDPE Pipe PN-6, Class PE-100 140 0.273
7 HDPE Pipe PN-6, Class PE-100 160 2.175
8 HDPE Pipe PN-6, Class PE-100 180 1.117
HSC Connection
Sno. Total Nos.
1 535
Other Details
2.70
0.00
2.59
23-Apr-2023
24-Dec-2024