Scheme ID: 20012166 Name of Scheme: Ronda WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2175 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2024 Actual Date of Completion (Capex): 23-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 PE100 63 4.8779
2 HDPE-PN-6 PE100 75 .0842
3 HDPE-PN-6 PE100 90 0.0545
4 HDPE-PN-6 PE100 110 0.0624
5 HDPE-PN-6 PE100 140 0.395
HSC Connection
Sno. Total Nos.
Other Details
2.06
0.00
1.94
24-Dec-2023
27-Dec-2024