Project Completion Certificate (Ground Water)
Scheme ID: 20012213 Name of Scheme: Haidarpur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2510 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 03-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.0 Mtr/ 113.33 Mtr Haidarpur 27.730330 79.986582
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.56 M³ Per Min /45Mtr Haidarpur 27.730330 79.986582
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 Mtr Haidarpur 27.730330 79.986582
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 G.I. Pipe 150 0.01864
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 2.194
2 HDPE Pipe PN-6 75 1.535
3 HDPE Pipe PN-6 90 1.479
4 HDPE Pipe PN-6 110 3.893
5 HDPE Pipe PN-6 140 0.018
6 HDPE Pipe PN-6 160 1.054
HSC Connection
Sno. Total Nos.
1 309
Other Details
2.60
2.31
2.31
04-Aug-2023
13-Dec-2024