Project Completion Certificate (Ground Water)
Scheme ID: 20012221 Name of Scheme: Hinguapur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1490 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Jan-2022 Actual Date of Completion (Capex): 11-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.05 Mtr/ 117.6 Mtr HINGUAPUR 27.518098 80.21207
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.2 M3/Min /45Mtr HINGUAPUR 27.518098 80.21207
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50KL/ 14Mtr HINGUAPUR 27.518098 80.21207
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 80 0.0098
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class PE-100 63 1.8057
2 HDPE Pipe PN-6: Class PE-100 75 1.7634
3 HDPE Pipe PN-6: Class PE-100 90 0.5057
4 HDPE Pipe PN-6: Class PE-100 125 0.017
5 HDPE Pipe PN-6: Class PE-100 140 0.708
HSC Connection
Sno. Total Nos.
1 294
Other Details
1.53
1.32
1.32
11-Dec-2023
30-Nov-2024