Project Completion Certificate (Ground Water)
Scheme ID: 20012236 Name of Scheme: Jalalpur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1810 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 10-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.0Mtr/ 87.0Mtr Jalalpur 27.052319 80.470921
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.41M³/Min /45Mtr Jalalpur 27.052319 80.470921
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/ 14Mtr Jalalpur 27.052338 80.470803
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 1.064
2 HDPE Pipe PN-6 75 1.327
3 HDPE Pipe PN-6 90 0.579
4 HDPE Pipe PN-6 110 0.289
5 HDPE Pipe PN-6 140 1.832
HSC Connection
Sno. Total Nos.
1 212
Other Details
1.87
1.62
1.62
13-Apr-2023
07-Dec-2024