Project Completion Certificate (Ground Water)
Scheme ID: 20012239 Name of Scheme: Chola WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3197 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-May-2023 Actual Date of Completion (Capex): 10-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.24 / 132.61 CHOLA 28.332904 77.783052
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 700 LPM / 46.60 M CHOLA 28.332904 77.783052
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT- 1 200 Kl / 12 M CHOLA 28.332954 77.782950
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0177
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.419
2 HDPE 75 0.576
3 HDPE 90 0.200
4 HDPE 140 0.173
5 HDPE 160 0.266
HSC Connection
Sno. Total Nos.
1 290
Other Details
2.21
1.80
1.83
12-May-2025
13-May-2025