| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012249 | Name of Scheme: Jalihapur (GOGP) | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3360 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 20-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 17.06Mtr/ 70.3Mtr | JALIHAPUR | 27.086506 | 80.25536 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.8M3/Min /45Mtr | JALIHAPUR | 27.086506 | 80.25536 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225KL/ 16Mtr | JALIHAPUR | 27.086506 | 80.25536 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.01764 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Pipe PN-6 Class PE-100 | 63 | 3.5295 | |
| 2 | Pipe PN-6 Class PE-100 | 75 | 5.2812 | |
| 3 | Pipe PN-6 Class PE-100 | 90 | 0.8887 | |
| 4 | Pipe PN-6 Class PE-100 | 110 | 0.5662 | |
| 5 | Pipe PN-6 Class PE-100 | 125 | 0.175 | |
| 6 | Pipe PN-6 Class PE-100 | 140 | 0.8945 | |
| 7 | Pipe PN-6 Class PE-100 | 160 | .591 | |
| 8 | Pipe PN-6 Class PE-100 | 200 | 0.303 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 582 |